Noble Interceptor
Handling IT business from newbuild to commissioning.
About the project
In December 2011, AkerBP awarded Noble Drilling a LoA for a Jack-up rig for Ivar Aasen development project. This rig is a CJ-70 ultra harsh environment jack-up rig, XL Enhanced 2, constructed in Singapore.
Option were asked to join this project in 2012 to handle IT related business in regards to Aker BP's operations on the Norwegian Continental Shelf (NCS). As AkerBP is an active operator on NCS with extensive experience in drilling operations and Option have experience in IT operations, the initial technical plans and requirements quickly set a scope of work.
The Noble Interceptor design (CJ-70) is one of the largest jack-up drilling rig´s in the world. Designing IT infrastructure and services were one of the main tasks that Option handled for AkerBP. The Scope of Work´s (SoW) key features/requirements:
Video conference systems | |
Offshore operation and collaboration room | |
Service and third party company interfacing | |
Office IT equipment (PC's, printers, monitors, etc.) | |
Server infrastructure and services | |
Data room services and design | |
Network infrastructure |
Design and delivery of infrastructure and services
Due to the fact that this vessel was built in Singapore, Option had to be on location together with AkerBP, Noble and other companies. This was to ensure the project progressed as scheduled. As the SoW were wide, the requirements and design were to be based on a long lifetime for both equipment and services, Option provided a complete package for services and equipment, as well as design changes to the planned offices and living quarters area on the rig.
Option based the delivery on:
A core infrastructure of servers, networks, IT equipment and services for long life and operations expectancy | |
Remote work station setup with our proprietary system DESKVIEW™ infrastructure and our own Rack Workstations | |
Due to space issue, we provided a silent rack solution for DESKVIEW™ located in an open landscape area | |
Offshore Operations Room with DESKVIEW™, Video conference and interfaced network and workstations | |
Interfacing and interconnecting network and services between third party companies, service companies and AkerBP | |
All expected office IT equipment and services | |
Wireless network access for users in office landscape | |
Full information synchronisation between onshore and offshore based on our SYNCSHARE™ system | |
Data room design and project management for service companies / third party companies | |
IT project management and advisory for AkerBP and other contractors | |
MEDICALL™ Telemedicine solution for the vessel's hospital |
Actual up-time close to 100%
The project phase in Singapore was based on planning and deciding the best solution for AkerBP. This phase was finished in April of 2014. The equipment installation and service commissioning was completed at Yeard outside Stavanger, Norway as of late 2014.
The project was delivered within the time frame and cost given and estimated. The project was handed over to Option Service and Operations team to manage and operate all equipment and services on behalf of AkerBP.
Option guarantee 99.7% up-time for services in our RigIT concept. The actual up-time for this vessel is actually closer to 100%.
Other projects
Island Innovator
Lundin Norway AS acquired the semisubmersible heavy well intervention rig Island Innovator on a two-year contract with Marine Accurate Well ASA. Several technical issues were identified and Option were chosen to deliver a technical solution to fix these issues.
Deepsea Bollsta
To support Shell and their 3rd parties activity in the South-Atlantic Ocean outside Namibia. Deepsea Bollsta were acquired from Odfjell Drilling in 2022. During transit towards Namibia, Option was tasked to plan, project and set up the KVM system for the operator and 3rd parties.
Not what you were looking for?
Let us know how we can help, we look forward to speaking to you.